Airports

This set of photos presents the typical process of breaking and removing thick airport concrete pavements. Break for removal of thick concrete runways, taxiways and aprons requires the 8600/T8600 Badger Breaker® with hammer drop heights of 7+ feet. Several breakers are often required to meet the contractor's accelerated schedule.

Interested in starting a project? Have a general question for us?

Choose one of the following links below to get in touch with us.

A Base Stacked for Strength

Reconstruction of a taxiway at Des Moines International Airport.

Download PDF

"IHC truly appreciated the opportunity to partner with you and your company. Your company was always dedicated to maintaining the schedule and upholding the highest standards of safety and quality. "

Eddie Davidsen, Project Manager, Interstate Highway Construction, Inc.

Read More

New Runway Ready for Take-Off

Rebuilding a critical runway at Fairchild Air Force Base required attention to every last detail - from the concrete to the construction technique to the calendar.

Download PDF