Ryan Rd, Oak Creek, WI, Break Concrete for Removal with MHBT

Antigo Construction breaking for removal 9″ thick, jointed reinforced concrete pavement (JRCP) on Ryan Road in Oak Creek, WI, using a MHBT Badger Breaker®. The MHBT broke the concrete to 18″ minus size. The prime contractor ripped through the broken JRCP with a frost tooth to sever the mesh reinforcement. The material was then windrowed in preparation for crushing on-site to produce crushed aggregate material for reuse on the project.