STH 13, Wisconsin Rapids, WI, Break Concrete for Removal with MHBT

Antigo Construction breaking for removal 9” thick, jointed plain concrete pavement (JPCP) on STH 13 at Wisconsin Rapids, WI, using a MHBT Badger Breaker®. The MHBT broke the concrete to 18” minus size particles. The contractor removed the broken concrete and replaced with 2.5” crushed aggregate and 6.5” asphalt over the existing base.