I-65 at Greenwood, IN, Break Concrete for Removal with MHB

Antigo Construction breaking for removal 9″ thick, continuously reinforced concrete pavement (CRCP) on I-65 at Greenwood, IN using a MHB Badger Breaker®. The MHB broke the concrete free from the rebar by using a rubblization breaking pattern. The prime contractor raked through the broken concrete with a ripper tooth to bring the rebar to the surface. A hydraulic shear was then used to cut the rebar to manageable lengths for recycling.