Controlled-Access Highways

This set of photos presents rubblization and asphalt overlay of controlled-access highways. Note the capability of the MHB Badger Breaker® to rubblize one lane while maintaining traffic in the adjacent lane. Multiple MHBs are utilized on high production projects.

Interested in starting a project? Have a general question for us?

Choose one of the following links below to get in touch with us.

Mechanistic Design Data from ODOT Instrumented Pavement Sites - Phase 1 Report

This investigation examined data obtained from three previously-instrumented pavement test sites in Oregon. Data processing algorithms and templates were developed for each test site that facilitated full processing of all the data to build databa...

Download PDF

Mechanistic Design Data from ODOT Instrumented Pavement Sites - Phase II Report

This investigation examined data obtained from three previously-instrumented pavement test sites in Oregon. Data processing algorithms and templates were developed for each test site that facilitated full processing of all the data to build databa...

Download PDF

Interstate Highway Rubblization Projects by State, 1996-2017

List of projects

Download PDF

Validation of Staged Construction Pavement Design with the Falling Weight Deflectometer

This paper documents the Illinois Tollway staff’s monitoring and observation process of the I-88 rubblization and asphalt overlay project during the first 9 years of service to validate the original design assumptions and verify the Stage 2 paveme...

Download PDF

0