Validation of Staged Construction Pavement Design with the Falling Weight Deflectometer

This paper documents the Illinois Tollway staff's monitoring and observation process of the I-88 rubblization and asphalt overlay project during the first 9 years of service to validate the original design assumptions and verify the Stage 2 pavement design strategy and overall pavement performance.

Download PDF